This microturbine project for Breitburn consisted of installing a new 12kv switchgear on the secondary side of a 2,000 kva oil filled substation transformer with a 2,500A bus 480V switchgear, a gas conditioning skid and 21 microturbines on an oil field site to provide co-generation of power. Gas piping was routed to the new gas conditioning skid by tying into the existing on-site gas service.